Build Process begins November 5, 2020
Build progress
November 5, 2020
Except for the 10 position switch, I have all the parts.
Today I drilled the holes on the pvc pipe. Then I mounted brass screws and the c85 comb with silicon glue.
I wrapped the wire on the pipe and shaved off the insulation at each brass screw.
==================================================================
November 6
My 10 position switch arrived in the mail today. I looked at it very carefully and determined which connection post is the common. Kind of funny they just dont mark it to make it obvious. It looks ok. I came with a lock washer and lock nut.
I still need a couple slide switches. I will need to connect the variable capacitor so that I can operate at two different ranges. I will also to install a switch to go around the tuner.
I am looking around to find switches in other equipment.
==============================================================
November 7
Today I bought a toggle switch from Lowes. I will install it to allow two ranges for the capacitor. My capacitor has 4 gangs so the switch will give the tuner some flexibility.
==============================================================
November 8
no effort today
==============================================================
November 9
no effort today
Comments
Post a Comment