Build Process begins November 5, 2020

Build progress

November 5, 2020

Except for the 10 position switch, I have all the parts.

Today I drilled the holes on the pvc pipe. Then I mounted brass screws and the c85 comb with silicon glue.

I wrapped the wire on the pipe and shaved off the insulation at each brass screw.

==================================================================

November 6

My 10 position switch arrived in the mail today. I looked at it very carefully and determined which connection post is the common. Kind of funny they just dont mark it to make it obvious. It looks ok. I came with a lock washer and lock nut.

I still need a couple slide switches.  I will need to connect the variable capacitor so that I can operate at two different ranges.  I will also to install a switch to go around the tuner.

I am looking around to find switches in other equipment.

==============================================================

November 7

Today I bought a toggle switch from Lowes.  I will install it to allow two ranges for the capacitor. My capacitor has 4 gangs so the switch will give the tuner some flexibility.

==============================================================

November 8

no effort today

==============================================================

November 9

no effort today